|
AXM Paper Space Scale Models | ||||||||||||||||||||||||||||||||||||||||||||||||||||
| The site for Space Shuttle Card Modelers | |||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||
|
STS-123 Payload (1J/A Assembly phase) Space Shuttle Endeavour was launched on March 11, 2008 on a mission to the ISS carrying the Japanese Experiment Logistic Module - Pressurized section, and DEXTRE (Special Purpose Dexterous Manipulator). It was one of the most challenging missions ever to take place, with 5 record EVA's. Endeavour was docked to the station for 12 days, a record. This papermodel is available via Paypal only. The details that helped design this model was obtained from NASA site and technical data from Robotics documentation. The ESP-2 configuration for this mission has been added to this page and is available for download in both 1:144 and 1:100 scales. This page will be updated soon with more photos. Enjoy this model!
BONUS: Space Station version models Download the ESP-2 in 1:144 scale Download the ESP-2 in 1:100 scale and its ORU's elements for this mission!!
1J/A, Kibo and Dextre patches source: www.spacefacts.de © 2008 All Rights Reserved |
|||||||||||||||||||||||||||||||||||||||||||||||||||||